Project Overview

Background

The original pipework system began to fail at the joints due to temperature-related stresses, resulting in severe leaks. In response, the client requested a full replacement of the existing system with stainless and mild steel pipework.

WhatsApp Image 2025-10-20 at 12.54.50_bcd591f4.jpg

Scope of Work – After Completion

The completed project involved the full installation of a stainless, and mild steel pipework system to support our client's process.

blow-off-tank-pipework.jpg

Project Breakdown

Project Design

Precision Arc Engineering was responsible for the complete design of the system. This included both internal and external layouts, encompassing all pipework, storage tanks, and instrumentation.

Screenshot 2025-10-20 125245.png

Fabrication

All pipework was fabricated in-house at our workshop. Site welding was conducted during installation, with all welds purged using high-purity argon to ensure cleanliness and prevent contamination.

20180205_164745.jpg

Project Management

We provided comprehensive end-to-end project management, maintaining close collaboration with the client throughout each phase to ensure successful delivery.

 

360_F_472546867_4MBw9cVFYE7AwnrIIbmZ8xXS0V3mrIzr.jpg

Testing

​The system was rigorously tested to ensure reliable and accurate operation under expected field conditions. The testing process included calibration of the dosing pumps, verification of control logic, and leak checks across all pipework and containment areas.

pressure-testing-in-sept-800.png

Get a free quote on a bespoke pipework or food industry project like this from PAE, the welding and fabrication experts.