Iver Water Treatment Works Project

Project Overview
Background
The original pipework system began to fail at the joints due to material fatigue, resulting in severe leaks. In response, the client requested a full replacement of the existing system with PVC pipework.

Scope of Work – After Completion
The completed project involved the full installation of a PVC pipework system to support our client's process.

Project Breakdown
Project Design
Precision Arc Engineering was responsible for the complete design of the Sodium Hypochlorite dosing system.

Fabrication
All pipework was fabricated and installed on site at Iver WTW. All pipework and instruments are WRAS approved and meet the industry standards.

Project Management
We provided comprehensive end-to-end project management, maintaining close collaboration with the client throughout each phase to ensure successful delivery.

Testing
​The Sodium Hypochlorite dosing system was rigorously tested to ensure reliable and accurate operation under expected field conditions.