Iver Water Treatment Works Project

8f4d5a84-f391-4cb1-be7d-854a187250e1.png

Project Overview

Background

The original pipework system began to fail at the joints due to material fatigue, resulting in severe leaks. In response, the client requested a full replacement of the existing system with PVC pipework.

2 Iver WTW Hypo Refurb Before.jpg

Scope of Work – After Completion

The completed project involved the full installation of a PVC pipework system to support our client's process.

WhatsApp Image 2025-10-20 at 13.10.00_e4b99942.jpg

Project Breakdown

Project Design

Precision Arc Engineering was responsible for the complete design of the Sodium Hypochlorite dosing system. 

Screenshot 2025-07-29 162109.png

Fabrication

All pipework was fabricated and installed on site at Iver WTW. All pipework and instruments are WRAS approved and meet the industry standards.

1 Iver WTW Hypo Refurb After.JPG

Project Management

We provided comprehensive end-to-end project management, maintaining close collaboration with the client throughout each phase to ensure successful delivery.

 

360_F_472546867_4MBw9cVFYE7AwnrIIbmZ8xXS0V3mrIzr.jpg

Testing

​The Sodium Hypochlorite dosing system was rigorously tested to ensure reliable and accurate operation under expected field conditions. 

pressure-testing-in-sept-800.png