EcoUrea Pipework Installation

IMG_6456.HEIC

Before

The original pipework system began to fail at the joints due to temperature-related stresses, resulting in severe leaks. In response, the client requested a full replacement of the existing system with stainless steel pipework.

WhatsApp Image 2025-06-01 at 14.22.06_989394f4.jpg

Project Design

Precision Arc Engineering was responsible for the complete design of the AdBlue mixing system. This included both internal and external layouts, encompassing all pipework, storage tanks, and instrumentation.

Screenshot 2024-04-12 084349.png

Fabrication

All pipework was fabricated in-house at our workshop. Site welding was conducted during installation, with all welds purged using high-purity argon to ensure cleanliness and prevent contamination.

20180207_113921.jpg

Scope of Work – After Completion

The completed project involved the full installation of a stainless steel pipework system to support an AdBlue mixing process.

IMG_6456.HEIC

Project Management

We provided comprehensive end-to-end project management, maintaining close collaboration with the client throughout each phase to ensure successful delivery.

Screenshot 2025-06-01 150217.png

Installation

Acting as the principal contractor, Precision Arc Engineering managed all aspects of the installation. This included mechanical pipework, electrical systems, and civil works, ensuring seamless integration across disciplines.

WhatsApp Image 2025-06-01 at 15.13.56_cea7ad50.jpg